Electrical products for a new apartment — the complete checklist (2026)
An ordered list of all the electrical products for a new apartment: what is mandatory from day one, what can wait, order of priorities according to budget and tips for coordinating supplies.
Step 1 — What must work on the day of the move
A refrigerator and a washing machine are the two products that you cannot live without. Immediately after them: a kettle and a microwave - the interim solution until the kitchen is functional, and an air conditioner if you move in summer or winter. This five is ordered so that it arrives on the day of receiving the key or the day after.
Step 2 — the full kitchen
A built-in oven, a stove and a hood — the billet trio is worth buying together, both because of design uniformity and because of package pricing. A dishwasher comes in here: in new contractor apartments there is almost always preparation for an integral dishwasher, and it would be a shame not to take advantage of it.
Before ordering, check the dimensions of the niches in the new kitchen - width, height and depth. In the contractor's apartments, the dimensions are usually standard (stove 60 cm, dishwasher 60 cm), but 'usually' is not a guarantee. We have a separate guide for built-in dimensions.
Step 3 — comfort and entertainment
TV for the living room (viewing distance is measured before determining the size), clothes dryer (in apartments without a yard or in the mountain cities - almost a must), vacuum cleaner - robotic, wireless or both, and small kitchen products: toaster, mixer, air fryer. These can join in a second wave, after the budget breathes.
A smart budget and purchase order
The principle: invest in products that work the hardest (refrigerator, washing machine, air conditioner), and save on products that are easy to upgrade later. A centralized purchase of the entire package in one store saves twice - both in the pricing of the package and in one centralized delivery.
With us, it works simply: you send the list of rooms, the dimensions of the niches and the budget on WhatsApp - and you receive an orderly offer for a complete package, with coordinated delivery and installation on the day of occupancy, throughout the north. This is how you enter an apartment that is already working.
Frequently asked questions
How long before entering the apartment should you order?
Two or three weeks before receiving the key is the ideal time: early enough so that everything is available, and late enough so that the occupancy date is already known. We save the order and deliver on the set date.
What do you do if the flooring/kitchen is delayed?
They update us and move the delivery date - such flexibility is exactly the advantage of a local store with personal attention, compared to an online order that arrives when it arrives.
Is installation included?
Delivery, delivery and installation at the customer's home are coordinated as part of the order - including connecting a washing machine, installing a built-in stove and installing air conditioners by qualified installers. The details and costs are closed in advance in the price quote, without surprises.
This guide was translated automatically from the Hebrew original.
